Split-core Hall Sensor for DC Energy Meter

AHKC-SC

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

  • Wide Measuring Range
  • High Overload
  • Good Linearity
  • Anti-interface

Highlight

What’s the Function of Acrel AHKC Series Split-core Hall Sensor for DC Energy Meter?

Theory

  • Hall Effect

 Primary

  • AC or DC 0-1500A

Secondary

  • 5V/4V
  • 4~20mA

Application

  • Measuring end for Solar and Wind energy

Specification

What’s the Specification of Acrel AHKC Series Split-core Hall Sensor for DC Energy Meter?

Photo
Specification AHKC-EKA AHKC-EKB AHKC-EKC
Inner Size Φ20 mm Φ40 mm Φ55 mm
Input Current AC/DC 0~(50-500) A AC/DC 0~(200-1000) A AC/DC 0~(500-1500) A
Output Signal 4-20mA, 0-20mA, 0-4V, 0-5V
Auxiliary Power 12V/24V, ±15V

Parameter

What’s the Parameter of Acrel AHKC Series Split-core Hall Sensor for DC Energy Meter?

Accuracy 1.0 class
Linearity ≤0.2% FS
Bandwidth 0-20 KHz
Response Time ≤5 μs
Withstand AC3500V
Temperature -40℃~85℃
Altitude ≤2000 m
Humidity ≤95%

Installation

How to Install the Acrel AHKC Series Split-core Hall Sensor for DC Energy Meter?

Request Information & Quotation

Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, [email protected]

If you have more detailed requirements, Please go to the relevant product page to submit the form.

Why choose Acrel?

  • 2003 Established
  • SZ.300286 Listed Company
  • 1200+ People
  • 25000+㎡ Plant
  • Factory Direct-sale

FAQ

Got a Question? Get your Answer

What are the Main Advantages of Acrel?

We have our own Factory and R&D Center

What are the Difference between Acrel and other Brands?

Rich product series: Cloud Platform, Gateway, Protection Device, Power Meter, Transformer

What Certificates does the Company have?

CNAS, ISO14001, ISO27001, ISO9001

What Certificates do the Products have?

CE, IEC, MID, UL, EAC, ROHS, REACH

How Expensive is Acrel Products?

Competitive Price with High Quality

How long is the product Warranty Period?

2 Years

What is the MOQ?

Purchasing according to your needs, no MOQ limit

How long is the Lead Time?

Sample takes 3 days; Bulk purchase takes 1 month

Three-phase Power Meter with MID for EV Charger

Standard:

2014/30/EU

2014/32/EU

2014/35/EU

IEC62052-11, IEC62053-22

EN61010-1, EN61000-3

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • 3P3L & 3P4L
  • Direct load 80A or via CT
  • Multi-Tariffs
  • Cost-effective

Rectangular Split-core Hall Sensor for DC Energy Meter

Standard:

IEC 61558-1

IEC 61558-2-15

IEC60364-7-710

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Capacity: 3.15, 5, 6.3, 8, 10 KVA
  • Noise Level: <40dB
  • Insulation Class: H
  • Short Circuit Voltage ≤ 3%
  • No-load Output Current ≤ 3%
  • Inrush Current ≤ 12 In
  • Leakage Current <0.2mA
  • Efficiency >96%

DC Insulation Monitor for EV Charger

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • System: 200~1000VDC
  • Auxi. Power: 9~36VDC
  • Insulation Resistance: 20 kΩ~10MΩ
  • Response Time: 3 ~ 60s

AC & DC Energy Meter for EV Charger Station

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • DC & AC Charger
  • Single & Three Phase
  • RS485 Modbus-RTU
  • WIFI 4G MQTT  JSON

DC Energy Meter for Charging Station with 2 Guns

Standard:

2014/30/EU

2014/35/EU

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Dual DC Circuits
  • Secondary RS485
  • DC1000V
  • 5s Accuracy

Single-phase WiFi MQTT Meter for EV Charger

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Wireless Comms.:4G, WiFi (MQTT, MODBUS-TCP)
  • Wired Comms.:RS485 (MODBUS-RTU)
  • I/O Function:1-way DI & 1-way DO
  • Temperature:2-way Cable Temperature Measurement
  • Pulse Output:Active Pulse Output

MID Power & Energy Meter for EV Charger

Standard:

2014/30/EU

2014/32/EU

2014/35/EU

IEC62052-11, IEC62053-22

EN61010-1, EN61000-3

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Single phase
  • Three phase
  • Direct load 80A or via CT
  • Multi-Tariffs
  • Cost-effective

DC Insulation Monitoring Device for EV Charger

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • DC System: 100~1000VDC
  • Auxi. Power: 9~36VDC
  • Insulation Resistance: 1 kΩ~10MΩ
  • Communication: Modbus-RTU

Three-phase WIFI MQTT Energy Meter

Standard:

2014/30/EU

EN IEC 61000

IEC 62052

IEC 62053

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • WIFI
  • MQTT
  • JSON
  • 3 phase

Single-phase Power Meter with MID for EV Charger

Standard:

2014/30/EU

2014/32/EU

2014/35/EU

IEC62052-11, IEC62053-22

EN61010-1, EN61000-3

 

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • 1-Phase 2-Wire
  • Direct load 80A
  • Multi-Tariffs
  • Cost-effective
    Top