In order to eliminate the influence of power distribution system harmonics on airport equipment, ANAPF active filters are configured in the plan to filter out the 2nd to 31st harmonic interference of the power grid.
ANAPF series active power filter devices are connected to the power grid in parallel. By detecting the harmonic and reactive power components of the load in real-time, PWM conversion technology is used to generate a corresponding harmonic component and reactive power component from the converter. The reverse component is injected into the power system in real-time, so as to realize harmonic control and reactive power compensation.
The Difficulty of Civil Airport Power Quality Management
Data Delay
Local Control
Manual Statistics
the Highlight of Civil Airport Power Quality Management Solution
the Solution for Civil Airport Power Quality Management
① Centralized compensation:
The substation is configured according to the transformer capacity,
Generally, harmonic compensation is configured according to about 20% of the rated current of the circuit breaker on the low-voltage side of the transformer, unit: A.
For example, a 2000kVA transformer, calculated according to the operating load rate of 80%, has a compensation capacity of 461A. It is recommended to configure it according to 500A. Each transformer is equipped with a set of ANAPF, which is installed between the reactive power compensation cabinet and the load for centralized compensation;
② Local compensation:
Combined with the harmonic characteristics of the baggage system and the specific power supply situation, it is possible to consider installing an active power filter.
The harmonics of the system are compensated locally on the low-voltage side, and an active power filter is installed at the port of the baggage expressway.
After a lot of practice, it has been proved that the harmonic current in the baggage consignment system can be effectively eliminated so that the harmonic current in the power grid can meet the established national standards.
2014/35/EU
2014/30/EU
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
EN IEC 61000
IEC 62052
IEC 62053
Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, feeling.chang@email.acrel.cn
Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, feeling.chang@email.acrel.cn