What Do Our Customers Say?
“ For over 4 years working with Acrel, they have continuously demonstrated excellent technical ability while ensuring superior customer service. Their collaborative approach and real time flexibility in adapting to changing conditions has contributed to the success of many project goals. "
Arnold
Philippines
Cloud Platform for Power IoT is a synchronous integrated solution from energy meter installation to web interactive interface that can see the benefits of features with the first click mouse. Very convenient and fast. I will be with this product for a long time.
Tuan
Vietnam
What’s the Function of Acrel ADF400L Series Wireless Multi Circuit Economy 7 Meter?
What’s the Specification of Acrel ADF400L series Wireless Multi Circuit Economy 7 Meter?
Compact Modular Design
● Main Body (LCD&Keypads HMI) ● 1-phase Metering Module ● 3-phase Metering Module ● Expanded Communication Module |
|
Multi Circuits Metering for 1-phase&3-phase
● 3 Types of Multi-circuits Combination ● Max 36 Circuits 1-phase Metering ● Max 12 Circuits 3-phase Metering ● Mixed (1-phase&3-phase Circuits Metering) |
|
Remote Switch Control
● Control&Read Status of Switches ● 2 DO&2 DI (Main Body) ● Dry Contact DI (Main Body) ● 4 DO&4 DI (CT operated Sub Module) ● 220V AC Wet Contact DI (CT operated Sub Module) |
What’s the Parameter of Wireless Multi Circuit Economy 7 Meter?
Parameter | Description&Value | |
Auxiliary
Power Supply |
Voltage | 3*220V/380V (for 3-phase sub modules) |
Power Consumption | ≤10W | |
Input
Voltage |
Rated Voltage | 3x 220/380V AC (3-phase) |
Frequency | 50Hz | |
Input
Current |
Rated Current | Max 80A Load Current (for 1-phase&3-phase sub module with direct connection); 3×1(6)A(for 3-phase sub module via CTs) |
Starting Current | 1‰ Ib (Class 0.5S) | |
Accuracy | Measurement | Class 0.5 |
Clock | ≤0.5s/d | |
Pulse |
Pulse Output | 1 Active Energy Pulse for each 3-phase Sub Module |
Pulse Width | 80ms±20ms | |
Pulse Constant | 6400imp/kWh (3-phase) | |
Communication | RS485 | MODBUS-RTU |
Infrared | For Prepaid Card Scanning | |
Ethernet | MODBUS-TCP | |
Environment | Operating Temperature | -20℃~+60℃ |
Storage Temperature | -30℃~+70℃ | |
Humidity | ≤95% (No condensation) | |
Altitude | <2000m |
How to Install the Wireless Multi Circuit Economy 7 Meter?
Main Body | Sub Module (Direct Connect) | Sub Module (Via CTs) | |
Direct Connect (1-phase&3-phase) | Connect via CTs (3-phase) |
Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, [email protected]
Got a Question? Get your Answer
We have our own Factory and R&D Center
Rich product series: Cloud Platform, Gateway, Protection Device, Power Meter, Transformer
CNAS, ISO14001, ISO27001, ISO9001
CE, IEC, MID, UL, EAC, ROHS, REACH
Competitive Price with High Quality
2 Years
Purchasing according to your needs, no MOQ limit
Sample takes 3 days; Bulk purchase takes 1 month
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
EN IEC 61000
IEC 62052
IEC 62053
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
EN IEC 61000
2014/35/EU
EN 61010
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
EN IEC 61000
IEC 62052
IEC 62053
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
EN IEC 61000
IEC 62052
IEC 62053
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
EN IEC 61000
IEC 62052
IEC 62053
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
EN IEC 61000
IEC 62052
IEC 62053
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
EN IEC 61000
2014/35/EU
EN 61010
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, [email protected]